Hydro-Flo Technologies, Inc.  The Art and Science of Wastewater Treatment

                  TECHNOLOGIES, INC.           The Art and Science... of Wastewater Treatment

A "Green" company
 since 1990

                   

HFT HOME

Hydro-Flo Technologies, Inc

Products

Batch and Continuous Flow Chemical Reaction Systems

pH adjustment, neutralization, precipitation and specialty chemical reaction systems

Clarifiers

Inclined Plate (IPC) Clarifiers

Control Panels

World class PLC and relay logic based panels

Flotation Systems

Traditional and lamella plate dissolved air flotation (DAF) systems

Media Filters

Sand (deep bed and high rate), multi-media and specialty filters

Media Packs

Media Packs for oil / water (immiscible liquids), DAF, sedimentation and custom separation systems

Oil Water Separators

API, enhanced gravity and pressurized separators suitable for any application

Packaged Systems

Pre-packaged turnkey systems for hundreds of applications

Pump Packages

Centrifugal, positive displacement and progressive cavity pump packages

HFT....

About Us

Company Profile

Customer List

Contact Us

Phone, E-mail, Fax, Etc...

Why Choose
Hydro-Flo Technologies

Request a Quote

E-Mail this page

E-Mail Us

 

 

Engineering Tools

Typical Applications

Follow this link to our library of application P&ID's and process descriptions

Application Questionnaire

Follow this link to our equipment application questionnaire

Clarifier Sizing information

Inclined Plate Clarifier Design Parameters
Detailed information on the design and sizing of inclined plate clarifiers and clarification systems

Dissolved Air Flotation System Design & Sizing information

Dissolved Air Flotation Design Parameters
Detailed information on the design and sizing of dissolved air flotation separators and separation systems

Oil Water Separator Design & Sizing information

Oil Water Separator Design Parameters
Detailed information on the design and sizing of oil water separators and separation systems

Misc Info, Data, Spreadsheets & Calculations

EPA Non-Polar Oil Test Methods

Fluid Mechanics

Reynolds Number Calculations

Water Hammer Calculations

HFT Quality Control

HFT Quality Assurance Plan

Steel Fabrications

Leak Test Certification

Interior Coatings

Exterior Coatings

Control Panels

Chemical / Material Compatibility Data

Chemical Pump Dosing Rates

Chemical Compatibility Chart

Properties of Plastic

Coating / Materials Data

Surface Prep Definitions

Gel Coat Cut Sheet

FRP Resin Cut Sheets

Hydro-Flo Technologies, Inc.
Quality Assurance Program

Steel Fabrications

The following procedures are employed to ensure conformance with quality and design specifications for steel weldment fabrications:

  1. Steel fabrication facilities are pre-inspected and are categorized according to their capability and experience in the following areas:

*      Truck access for raw material and fabricated weldments.
*      Steel stock storage capability.
*      Lifting, bending, shearing capabilities.
*      Welding area size and access capability.
*      Welding equipment type and capability.
*      Welders AWS or ASME current certification and qualification levels.
*      General shop appearance, neat, orderly, safe.
*      Safety procedures documentation.
*      Personnel protective equipment use, familiarity, and condition.

  1. Design and fabrication drawings are produced at Hydro-Flo Technologies.  Final drawings are approved by an Engineering Department designee for completeness, conformance with project specification, conformance with in-house specifications, and safety.
     

  2. Fabrication of steel weldments is inspected by a Hydro-Flo Technologies Production Department designee for conformance with Hydro-Flo Technologies fabrication drawings prior to acceptance by Hydro-Flo Technologies.  The following are minimum conformance inspection procedures:

*      Nozzle type, placement, size.
*      Dimensional conformance, entire weldment.
*      Warp or other disfiguration.
*      Weld porosity and appearance.
*      Weld leak testing with dye penatrant.
*      Special appurtenance detail conformance.
*      All edges checked for smoothness.  NO sharp edges allowed!

  1. Steel coating facilities are pre-inspected and are categorized according to their capability and experience in the following areas:

*      Truck access for fabricated weldments.
*      Coating stock storage capability.
*      Surface preparation systems capabilities.
*      Coating area size and access capability.
*      Coating equipment type and capability.
*      Coating application personnel’s current certification and qualification levels (if any).
*      General shop appearance, neat, orderly, safe.
*      Safety procedures documentation.
*      Personnel protective equipment use, familiarity, and condition.

  1. Coating of steel weldments is inspected by a Hydro-Flo Technologies Production Department designee for conformance with Hydro-Flo Technologies fabrication drawings and coatings specifications prior to acceptance by Hydro-Flo Technologies.  The following are minimum conformance inspection procedures:

*      Surface preparation conformity including steel exposure limits prior to coating application.
*      DFT and WFT conformity (as applicable).
*      Holiday investigation.
*      Weld coatings appearance.
*      All edges checked for smoothness and coating coverage.  NO sharp edges allowed!

  1. Final shop inspection at Hydro-Flo Technologies during and after final assembly is performed by the Hydro-Flo Technologies Production Manager.  Final inspections include at minimum:

*      Conformity of the entire system to the fabrication and shop assembly drawings and documents.
*      Form/fit/and function of all major and minor components and appurtenance.
*      Electrical system checkout including logic controls for proper operation, load and configuration.
*      Proper preparation for shipment and storage. 
*      Protective enclosures and skids, temporary preservative coatings.
*      Partial disassembly and packaging of certain components for secure shipment.
*      Lifting, trucking, safety, and handling labels.
*      Shipping document preparation and notification of receiving party.

  1. Field follow-up includes phone contact with project manager or other appropriate designee to obtain immediate feedback.  Long term quality feedback includes a quality satisfaction survey form sent to the project manager or other appropriate designee to solicit feedback.  Any problems listed on the quality survey form are immediately addressed by Hydro-Flo Technologies management.  Quality excursions (if any) are addressed with the appropriate department and steps are implemented to ensure elimination of problem areas.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 