Quality Assurance Program
Steel Fabrications
The following procedures are employed to ensure conformance with
quality and design specifications for steel weldment fabrications:
-
Steel fabrication facilities are
pre-inspected and are categorized according to their capability
and experience in the following areas:
* Truck access for raw material
and fabricated weldments.
* Steel stock storage capability.
* Lifting, bending, shearing capabilities.
* Welding area size and access capability.
* Welding equipment type and capability.
* Welders AWS or ASME current certification and
qualification levels.
* General shop appearance, neat, orderly, safe.
* Safety procedures documentation.
* Personnel protective equipment use, familiarity, and
condition.
-
Design and fabrication drawings are
produced at Hydro-Flo Technologies. Final drawings are approved
by an Engineering Department designee for completeness,
conformance with project specification, conformance with
in-house specifications, and safety.
-
Fabrication of steel weldments is inspected
by a Hydro-Flo Technologies Production Department designee for
conformance with Hydro-Flo Technologies fabrication drawings
prior to acceptance by Hydro-Flo Technologies. The following
are minimum conformance inspection procedures:
* Nozzle type, placement, size.
* Dimensional conformance, entire weldment.
* Warp or other disfiguration.
* Weld porosity and appearance.
* Weld leak testing with dye penatrant.
* Special appurtenance detail conformance.
* All edges checked for smoothness. NO sharp edges
allowed!
-
Steel coating facilities are pre-inspected
and are categorized according to their capability and experience
in the following areas:
* Truck access for fabricated
weldments.
* Coating stock storage capability.
* Surface preparation systems capabilities.
* Coating area size and access capability.
* Coating equipment type and capability.
* Coating application personnel’s current certification
and qualification levels (if any).
* General shop appearance, neat, orderly, safe.
* Safety procedures documentation.
* Personnel protective equipment use, familiarity, and
condition.
-
Coating of steel weldments is inspected by
a Hydro-Flo Technologies Production Department designee for
conformance with Hydro-Flo Technologies fabrication drawings and
coatings specifications prior to acceptance by Hydro-Flo
Technologies. The following are minimum conformance inspection
procedures:
* Surface preparation conformity
including steel exposure limits prior to coating
application.
* DFT and WFT conformity (as applicable).
* Holiday investigation.
* Weld coatings appearance.
* All edges checked for smoothness and coating
coverage. NO sharp edges allowed!
-
Final shop inspection at Hydro-Flo
Technologies during and after final assembly is performed by the
Hydro-Flo Technologies Production Manager. Final inspections
include at minimum:
* Conformity of the entire system
to the fabrication and shop assembly drawings and documents.
* Form/fit/and function of all major and minor
components and appurtenance.
* Electrical system checkout including logic controls
for proper operation, load and configuration.
* Proper preparation for shipment and storage.
* Protective enclosures and skids, temporary
preservative coatings.
* Partial disassembly and packaging of certain
components for secure shipment.
* Lifting, trucking, safety, and handling labels.
* Shipping document preparation and notification of
receiving party.
-
Field follow-up includes phone contact with
project manager or other appropriate designee to obtain
immediate feedback. Long term quality feedback includes a
quality satisfaction survey form sent to the project manager or
other appropriate designee to solicit feedback. Any problems
listed on the quality survey form are immediately addressed by
Hydro-Flo Technologies management. Quality excursions (if any)
are addressed with the appropriate department and steps are
implemented to ensure elimination of problem areas.
|
|